Entries by centuryac

15-Ton RTU

A 15-ton roof top package unit manufactured by RUUD installed on an industrial building using a crane to place the equipment. A custom roof curb adapter was fabricated to accept the new design of the unit cabinet.

Server Room with 4 Systems

Installation of four specialty systems, manufactured by Stulz, in a computer server room completed 3-2013. The condensers were mounted on the roof, lifted into place by a crane. The evaporator sections were mated to specialty dehumidifiers with integrated controls. These systems are designed to run continuously, maintaining low temperatures and low humidity in computer server […]

Commercial Project – Kirby Drive – 12.5 ton

A 12.5-ton Goodman Manufacturing roof top gas package unit set recently on a location on Kirby Drive. The photo shows the unit set upon the existing roof curb (saving the customer approximately $1,000). The condensate drain line with code required trap for proper drainage. The electrical disconnect and conduit enclosed wiring, and the fresh air […]

Yorktown Townhouse Project

A recent 3-ton RUUD heat pump system installed in an older Galleria area townhome (4-2013). Note the attic was very tight and the crew had to work within the confines of the framing. The attic access door was too small for the new equipment to fit through, and the equipment had to be dismantled, carried […]

Ductless Mini-Split System

A ductless mini-split system was installed in a small kitchen with low air flow from the primary air conditioning system to resolve air flow issues in a townhome in the Galleria area. Shows the unit leveled and mounted on wall brackets to raise it above the soil, the wiring enclosed in conduit and sealed as […]

RUUD RGPE Furnace and RUUD UARL Condenser

These photos show the condenser and furnace components of a two RUUD high-efficiency 16 SEER 2-stage systems with integrated humidity control functions installed recently in a residential home in a gated community in the Memorial area. The home has five systems. The two 5-ton systems were replaced simultaneously in 8-2012. The condensers were installed to […]